![]() |
Risk Assesment |
The Risk Assement shown here is a table constructed which outlines the potential risks within the choosen location of filming. My group and myself assessed the room for dangers, listed them into the table and discussed ways in which we can work to minimise and avoid the accidents.
![]() |
Cast, Props and Costume list |
The props and costumes needed throughout production are listed in this piece of pre- production work. The cast are also listed.
No comments:
Post a Comment